Production Lead Time
We manufacture all foundation bolts to your required specifications. To ensure fast and accurate delivery, please note our standard production times below.
| Product Type | Quantity | Production Time* |
|---|---|---|
| Straight Foundation Bolts | 1–100 pcs | 1 Working Day |
| L-Bolts | 1–100 pcs | 1 Working Day |
| J-Bolts | 1–100 pcs | 1 Working Day |
| Double Threaded Bolts | 1–100 pcs | 1 Working Day |
| Full Threaded Rods | 1–100 pcs | 1 Working Day |
| Straight Foundation Bolts | 100–1,000 pcs | 2 Working Days |
| L-Bolts | 100–1,000 pcs | 2 Working Days |
| J-Bolts | 100–1,000 pcs | 2 Working Days |
| Double Threaded Bolts | 100–1,000 pcs | 2 Working Days |
| Full Threaded Rods | 100–1,000 pcs | 2 Working Days |
What’s Included?
Our lead times include:
- ✔ Cutting and fabrication
- ✔ Thread rolling/thread cutting
- ✔ Bending (for L-Bolts and J-Bolts)
- ✔ Nut and washer fitting (if ordered)
- ✔ Hot-dip galvanising or black finish
- ✔ Final quality inspection
- ✔ Packaging ready for collection or dispatch
Important Information
- Production begins after your order specifications have been confirmed.
- Custom dimensions and non-standard bolt sizes may require additional production time.
- Working days exclude weekends and public holidays.
- Delivery or courier transit time is not included in the production time.
- Urgent or same-day orders may be accommodated depending on production capacity. Please contact us before placing your order.
Standard Lead Time Summary
🟢 1–100 Pieces → Ready in 1 Working Day (including production and galvanising)
🟢 100–1,000 Pieces → Ready in 2 Working Days (including production and galvanising)
Fast. Accurate. Built to Specification.
Our goal is to manufacture and deliver high-quality foundation bolts and threaded rods with the shortest possible turnaround while maintaining strict quality standards.