Steel & prefabs ltd

Production & Delivery Guide

Production Lead Time

We manufacture all foundation bolts to your required specifications. To ensure fast and accurate delivery, please note our standard production times below.

Product TypeQuantityProduction Time*
Straight Foundation Bolts1–100 pcs1 Working Day
L-Bolts1–100 pcs1 Working Day
J-Bolts1–100 pcs1 Working Day
Double Threaded Bolts1–100 pcs1 Working Day
Full Threaded Rods1–100 pcs1 Working Day
Straight Foundation Bolts100–1,000 pcs2 Working Days
L-Bolts100–1,000 pcs2 Working Days
J-Bolts100–1,000 pcs2 Working Days
Double Threaded Bolts100–1,000 pcs2 Working Days
Full Threaded Rods100–1,000 pcs2 Working Days

What’s Included?

Our lead times include:

  • ✔ Cutting and fabrication
  • ✔ Thread rolling/thread cutting
  • ✔ Bending (for L-Bolts and J-Bolts)
  • ✔ Nut and washer fitting (if ordered)
  • ✔ Hot-dip galvanising or black finish
  • ✔ Final quality inspection
  • ✔ Packaging ready for collection or dispatch

Important Information

  • Production begins after your order specifications have been confirmed.
  • Custom dimensions and non-standard bolt sizes may require additional production time.
  • Working days exclude weekends and public holidays.
  • Delivery or courier transit time is not included in the production time.
  • Urgent or same-day orders may be accommodated depending on production capacity. Please contact us before placing your order.

Standard Lead Time Summary

🟢 1–100 PiecesReady in 1 Working Day (including production and galvanising)

🟢 100–1,000 PiecesReady in 2 Working Days (including production and galvanising)

Fast. Accurate. Built to Specification.
Our goal is to manufacture and deliver high-quality foundation bolts and threaded rods with the shortest possible turnaround while maintaining strict quality standards.

Leave a Comment

Your email address will not be published. Required fields are marked *

Shopping Cart